Skip to content

Northern Utah

Combined turf and paver backyard builds

The full backyard: turf where you want soft, pavers where you want to put furniture. Designed and built as one job.

Evening aerial of a turf and hardscape backyard with defined seating area
What's included© 2026

Every job, every time.

This is the majority of what we build. A turf-only yard has nowhere to put a table. A hardscape-only yard has nowhere for kids or dogs. Doing both at once is also cheaper than doing them a year apart — the demo, the base work, the equipment, and the haul-off all happen once.

  • Full backyard layout: circulation, seating, play area, and sightlines
  • Shared excavation and base work across turf and hardscape zones
  • Flush transitions between paver and turf surfaces
  • Drainage planned across the whole yard rather than zone by zone
  • Optional additions: fire pit, seat wall, steps, planter beds, lighting
  • One schedule, one crew sequence, one written scope
Utah specifics© 2026

What changes because this is Utah

These are the things that decide whether the yard holds up. Ask any bid you get about them.

Do the drainage math once, for the whole yard

The most common mistake in a two-phase backyard is that the patio installed this year sends water into the turf installed next year. Planning both surfaces together means one grade plan and one drainage solution instead of two that fight each other.

The transition detail is what makes it look expensive

Turf meeting pavers should be flush and tight, with the turf edge secured against a hard restraint. A sloppy transition is the first thing the eye catches and the first place the turf edge starts lifting.

Combining phases saves real money

Mobilization, demo, haul-off, and equipment rental are largely fixed costs. Splitting a backyard into two jobs means paying most of them twice.

Process© 2026

How the job runs*

  1. 01

    Yard measurement

    We map the whole yard, not just the area you were thinking about.

  2. 02

    Layout + quote

    You see the zones, materials, and a single written scope for the full build.

  3. 03

    Build

    Hardscape first, turf last, so the finished turf is never a work surface.

  4. 04

    Walkthrough

    Full yard review, drainage explanation, and maintenance.

Combined builds are quoted as one project. The turf portion carries a per-square-foot rate; the hardscape is scoped by the job.See what drives the number.

Questions© 2026

Turf + Pavers questions

Should I do it all at once or phase it?

All at once is meaningfully cheaper per square foot because you pay the setup costs once. If budget forces a phase, we still design the whole yard first so phase one does not have to be torn out for phase two.

Which goes in first?

Hardscape. It involves heavy equipment, cutting, and dust. Turf goes in last so it is never used as a staging area.

How long does a full backyard take?

Typically one to three weeks depending on scope, access, and weather.

Next step© 2026

Get a free yard estimate*

Send your address and a couple of photos. We come measure, and you get a written number with base depth and materials spelled out.

Get my free estimate